Intelligent Integrated Workover Wellhead Equipment

Intelligent Integrated Workover Wellhead Equipment

Intelligent Integrated Workover Wellhead Equipment

The CH Intelligent Integrated Workover Wellhead Equipment is a comprehensive solution that incorporates advanced technologies and equipment to enhance the safety, efficiency, and intelligence of workover operations. With an integrated control system, operators can precisely control workover equipment from a safe distance, reducing operational risks and achieving remote intelligent control of workover activities. It features data collection and video monitoring functions, providing real-time information about the operation site and comprehensive status monitoring for operators.

Description Inquery

Product Features:

1.Workover Catwalk: Enables rapid automatic transfer of drill tools to and from the work platform and automatic racking.

2.Alignment and Buffering Manipulator: Provides alignment and buffering functions for tubing at the wellhead.

3.Workover Iron Roughneck: Automates the makeup and breakout of tubing during operations.

4.Workover Monkey Board Manipulator: Ensures fast and precise placement of tubing in the monkey board.

5.Hydraulic Elevator: Automates the opening, closing, and rotating of the elevator.

6.Pneumatic Slip: Automatically grips drill tools at the wellhead.

7.Multifunctional Operation Platform: Serves as the operational platform for the integrated equipment.

8.Integrated Control System: Centralizes control of the automated tubing handling system and provides video monitoring.

* First Name:

Plsease input value

* Last Name:

Plsease input value

Company name:
Telephone number:
Mobile phone number:
* E-mail:

Error E-mail format

Country:
Address:
* Your Inquiry:

Plsease input value